• Solutions
  • Company
  • Careers
  • Resources
Get in touch
  • Solutions
  • Company
  • Careers
  • Resources
Get in touch
  • Underfloor heating systems
  • TABS
  • Low-rise building systems
  • Assembly components
  • Geothermal drilling
  • Dismantling & Installation
  • About us
  • Careers
  • Vacancies
  • News & Blog
  • Case Studies
  • Legal Notice
  • Data Protection
  • Accessibility Statement
  • Cookie Settings
All content on this website is provided for general information purposes only. We accept no liability for its accuracy, completeness or timeliness.
® 2026 Norline AG
Created with love by pechschwarz®

Dismantling and installation of a fire-fighting water main in the Seelisberg Tunnel

5
Kilometres of tunnel length
10
Staff on night duty
150
Pipe sections dismantled and removed; 200 pipe sections installed

In the Seelisberg Tunnel, Norline carried out a precise dismantling, removal and installation process under challenging conditions.

Visit website
Industry
National infrastructure
Performance range
Dismantling & Installation
Cooperation
since 2021
Technology in action
2 lorries with cranes, 10 specialist staff members
4,4 Sterne auf Google
Sign up for our newsletter

Verbunden mit Ihrem POS bieten wir Ihnen den einzigen Kartenleser, der speziell für Restaurants entwickelt wurde.

In the Seelisberg Tunnel, a key infrastructure component of the north-south axis, Norline carried out precise dismantling, removal and installation work under challenging conditions. The work was carried out at night whilst the tunnel remained in operation.

A specialist company for dismantling, removal and installation

The Federal Roads Office, as the end client, has once again selected Norline – based on its track record in previous tunnel construction projects – to carry out the dismantling and removal of the existing pipework and the installation of the new pipework, recognising it as an experienced specialist contractor with proven expertise in precisely these stages of the work.

The situation at the Seelisberg Tunnel

Working in motorway tunnels requires relevant experience as well as knowledge of the applicable rules and regulations. The work was carried out whilst the motorway remained open to traffic, in the immediate vicinity of the carriageway. It was precisely there that the existing pipework had to be dismantled and the new pipework reinstalled.

Explore other Stories from our Customers

Loading and unloading using a mobile crane

Once dismantled, the old pipe sections had to be loaded onto lorries and transported out of the tunnel. Following the dismantling and removal, the components for the new pipeline were delivered and subsequently installed by a contractor specialising in pipeline construction.

The pipe sections were gradually removed and reinstalled at night whilst operations continued.